Local marine notices

Port:
Date From:
Today
Date To:
Today
A01-2017 Dredging Works Cautionary Zones
Date published: 29 Mar, 2017 | Port of Ashburton

Port users are advised that Dredging Operation at the Port of Ashburton has been extended up until the 31st May 2017

Download Notice
D6-2017(P) - Woodside Facilities Re-declaration
Date published: 24 Mar, 2017 | Port of Dampier
Woodside channel and berth pocket declarations
Download Notice
A05-2017(P) - Port of Ashburton MOF Tug Pen Depth Declaration
Date published: 17 Mar, 2017 | Port of Ashburton

The Port of Ashburton MOF tug pens have been surveyed and the results analysed

Download Notice
D5-2017-Amendment to Oil Tanker Pilot Boarding Area
Date published: 2 Mar, 2017 | Port of Dampier

Port users are advised that with immediate effect all oil tankers calling the Port of Dampier will be allocated a Western Anchorage while waiting to berth.

Download Notice
A03-2017 Port of Ashburton Hydrographic Survey
Date published: 1 Mar, 2017 | Port of Ashburton

Port users are advised Pilbara Ports Authority is conducting a Hydrographic Survey over a number of areas within the Port of Ashburton and Port of Onslow.

Download Notice
D4-2017 (P) Rio Tinto Facilities Re-declaration
Date published: 28 Feb, 2017 | Port of Dampier
Berth depths declared
Download Notice
A02-2017 - Navigation Aid Temporarily Shifted
Date published: 27 Feb, 2017 | Port of Ashburton

Port users are advised that Navigation Aid NA38 Yellow Buoy Fl.Y.4s has been altered in position.

Download Notice
Capital Dredging Project in South East Creek for the Pilbara Marine Tug Haven (PH07/17 T)
Date published: 24 Feb, 2017 | Port of Port Hedland

Mariners are advised that capital dredging in South East Creek will commence on the 6th March 2017. The dredging is expected to take three to four months to complete.

Download Notice
Geotechnical Sampling Works - Update (PH05/17 T)
Date published: 22 Feb, 2017 | Port of Port Hedland

The Jack Up Barge Sealift 5 will shortly commence taking core and sediment samples from eight (8) locations between channel escape area 1W to an area North of C3 beacon.

Download Notice
Hydrographic Survey Operations (PH 02/17 T)
Date published: 30 Jan, 2017 | Port of Port Hedland
Mariners are advised that the Go Puriya will be conducting Hydrographic Survey Operations for approximately the next two weeks.
Download Notice
Displaying results 1-10 (of 63)
 |<  < 1 - 2 - 3 - 4 - 5 - 6 - 7  >  >| 

No Alerts